AdvancedThe design cycle has five steps: define, design, build, test, improve. The earmuffs must weigh under 200 g, cut noise by at least 20 decibels, and cost under HK$50.
- Design cycle: define → design → build → test → improve.
- Specs: under 200 g, cut at least 20 dB, within HK$50.
- Insulation comes from soft porous materials; pads must seal well.
文體小知識:記敘文記下動手做的過程。這一篇跟小工程師用設計循環造隔音耳罩,從測試數據中學會改良。
§Text Passage
1In the home economics room the mixer roars at 90 decibels — loud enough to harm hearing over time. The school holds an engineering design activity: Primary 5 students use the design cycle to design and build earmuffs that protect people working in noisy places. A fine chance for little engineers to shine.
2Engineers solve problems by a fixed method called the design cycle: first, define the problem — what exactly must be solved, and for whom; second, design — draw sketches and choose materials; third, build a prototype, the first model; fourth, test, measuring whether the prototype meets the targets; fifth, improve — revise according to the tests and test again until the requirements are met.
3This activity sets three requirements (specifications): the earmuffs must weigh no more than 200 grams; they must cut the noise by at least 20 decibels; the materials must cost no more than HK$50. Available materials are sound-insulating ones such as foam sponge, foam board, bubble wrap and old felt, and the only tools are scissors and glue, so students must use limited resources wisely.
4The building is lively: one group sandwiches a foam board between two thick sponges, imitating professional earmuffs; another wraps the shell in bubble wrap and lines it with felt. Finished prototypes face three tests: an electronic scale for weight, a decibel meter for the drop in sound when worn, and an item-by-item cost count.
5Test data honestly show a design's strengths and flaws: groups that pass summarise why they succeeded; groups that fall short need not lose heart, for the design cycle itself includes improvement — swap materials, thicken the insulating layer, trim needless decoration, and run a second test. Engineers make products better and better through exactly this loop of testing and improving.
6Everyone finishing the activity agreed that being an engineer is no easy job: it takes scientific knowledge, careful budgeting and teamwork. A small pair of earmuffs showed the power of the design cycle: define, design, build, test, improve systematically, and even hard problems yield step by step.
1Summary 重點摘要
The design cycle has five steps: define, design, build, test, improve. The earmuffs must weigh under 200 g, cut noise by at least 20 decibels, and cost under HK$50.
2Vocabulary cards Vocabulary
The engineer's steps: define the problem, design, build, test, improve.
A person who uses science and maths to design products and solve problems.
The first model of a product, built to test whether the design works.
Material that blocks or absorbs sound, such as sponge and foam.
Measuring whether the prototype meets the targets, such as weight and noise reduction.
The unit of loudness; cutting 20 decibels means the sound drops by 20.
The requirements a design must meet, such as limits on weight and cost.
The ceiling of money available — HK$50 in this earmuff project.
Revising the design from test results so the product better meets the targets.
A scale showing weight in numbers, used to check the 200-gram limit.
3Step by step Steps
- Step 1: Define the problem and the requirementsThe first step of engineering is not building but understanding. The problem here: noise of 90 decibels harms hearing, so we need earmuffs that insulate sound effectively. Three specifications: no heavier than 200 grams so they can be worn long; cutting noise by at least 20 decibels; materials within a HK$50 budget. Writing the requirements clearly gives every later step a firm basis, so no effort is wasted.
- Step 2: Design and choose materialsBegin with sketches marking the earmuffs' shape, the layers of the ear pads and the materials. Sound insulation works by blocking and absorbing sound, so choose soft, porous insulating materials: sponge is soft on the ears, foam board is light, bubble wrap seals and muffles, felt makes a comfy lining. Mind the cost too — price every item to stay within HK$50 — and since the only tools are scissors and glue, the design must be easy to cut and glue.
- Step 3: Build the prototypeFollowing the sketch, build the first model, the prototype. The steps: cut two shells and the ear pads, glue the insulating layers together, and add a headband joining the two sides. Take care: the pads must sit snugly all around the ears, or sound will leak through gaps; the headband must be neither too tight, which hurts, nor too loose, which leaks. Check the finish and sturdiness yourself before handing it to testing.
- Step 4: Test the three specificationsTesting must be fair and accurate. Weight: place the earmuffs on an electronic scale, note the number, and compare with the 200-gram limit. Noise reduction: measure the sound level with a decibel meter at a fixed source, then measure again wearing the muffs; the difference is the reduction, to compare with the 20-decibel floor. Cost: price every material used against the HK$50 budget. Change only one condition at a time so the data stay reliable, and record the results honestly.
- Step 5: Improve according to the dataAfter testing, analyse against the three specs: too heavy — swap to lighter foam or trim the excess; not enough reduction — thicken the sponge or hunt for leaking gaps around the pads; over budget — switch to recycled materials or drop the decorations. Revise, test again, and loop until all three pass. This is the spirit of the design cycle: prototypes seldom succeed at first, and engineers improve through data, not luck.
- Step 6: Sum up and shareWhen the design is done, report to the class: what the problem was, how the design was conceived, what the tests showed, and what was improved. Listening to others is vital training for engineers too — another group's earmuffs may hold lessons worth borrowing. Looking back, we used science (sound and insulation), mathematics (weight, decibels and cost) and teamwork — the very heart of the science, technology, engineering and society curriculum.
5Worked example Example
Example: Two groups test their earmuffs. Targets: no more than 200 grams, noise cut by at least 20 decibels, materials within HK$50. Group A: 180 g, sound drops from 85 to 58 decibels, cost $45. Group B: 215 g, sound drops from 85 to 70 decibels, cost $58. Which group passes? How can Group B improve?
- Check Group A against the specs: 180 g is under the 200-gram limit — pass.
- Group A's reduction: 85 minus 58 equals 27 decibels, above the 20-decibel floor; the $45 cost is under $50. Group A passes all three.
- Check Group B: 215 g exceeds the limit — fail; the reduction is only 85 minus 70, or 15 decibels, short of 20 — fail; $58 exceeds the budget — fail. Group B fails all three.
- Analyse Group B's problems: materials too heavy, too thin an insulating layer, and too much material spent.
- Improvements: switch to lighter foam to cut weight; thicken or double the sponge layer to boost reduction; use recycled materials and trim decorations to save cost, then test again.
- Answer: Group A passes all three: 180 g under the weight limit, a 27-decibel cut above the 20-decibel floor, and $45 within the $50 budget. Group B fails all three: 215 g is overweight, it cuts only 15 decibels, and $58 overshoots the budget. Group B should switch to lighter foam to lose weight, thicken or double the sponge layer for better insulation, use recycled materials and drop decorations to meet the budget — then test again through the design cycle until all three specs pass.
6Common mistakes Mistakes
7Quick check Quick check
Q1What are the five steps of the design cycle?
Q2What is the weight limit of the earmuffs?
Q3By how many decibels must the muffs cut noise at least?
Q4What is the materials budget for the project?
Q5How is the decibel reduction calculated in testing?
8Recap Recap
- Design cycle: define → design → build → test → improve.
- Specs: under 200 g, cut at least 20 dB, within HK$50.
- Insulation comes from soft porous materials; pads must seal well.
- Test fairly: fix the conditions and record data honestly.
- Prototypes rarely succeed first time; improve by data until all pass.